How we build: from sketch to keys in 7 steps

A clear, engineered process with two tracks running in parallel — fabrication and site work — so your building is ready weeks or months sooner.

01

Consultation & site visit

Tell us what you want to build, your budget and timeline. We visit the site, check access, soil and levels, and recommend the right system — LGSF, precast EPS or modular.

  • Free first consultation
  • Site & access survey
  • Budget and system recommendation
Consultation & site visit — Site discussion team
02

Design & engineering

Our team turns your idea into architectural drawings, 3D views and a full structural design of every steel member, so there are no surprises later.

  • Plans, elevations & 3D views
  • Structural design & BOQ
  • Drawings for permit approval
Design & engineering — Design floor planDesign & engineering — LGSF factory sections
03

Fabrication

Steel sections are machine-cut, punched and labelled for each wall, floor and truss. While this happens, the foundation is prepared on site — two tracks in parallel.

  • Precision-cut galvanised steel
  • Every member labelled
  • Quality checked before dispatch
Fabrication — LGSF steel profiles
04

Foundation & anchoring

A lighter building needs a lighter foundation. Base tracks are levelled and fixed to the plinth with anchor bolts, ready for the frame.

  • Raised plinth / pedestal footings
  • Chemical & mechanical anchors
  • Level and line checks
Foundation & anchoring — Wall anchoring foundationFoundation & anchoring — Anchor bolting
05

Frame erection

Wall panels are assembled, lifted and screwed together. The building takes shape in days — on site you see the whole structure rise, floor by floor.

  • Panelised wall assembly
  • Self-drilling screw connections
  • Plumb, bracing & alignment checks
Frame erection — LGSF frame erectionFrame erection — Screw connections
06

Roof & waterproofing

Trusses go up, the roof is sheeted or slabbed, and every joint is sealed with weatherproof membranes before the monsoon gets a chance.

  • Steel roof trusses
  • Membrane & rubber waterproofing
  • Gutters and drainage
Roof & waterproofing — Roof truss assemblyRoof & waterproofing — Rubber waterproofing
07

Finishes & handover

Insulation, boards, electrical, plumbing, doors, windows and paint — then a final inspection, a walk-through with you, and the keys.

  • Insulation, boarding & cladding
  • MEP, interiors & paint
  • Final inspection & handover
Finishes & handover — LGSF home structure complete
Inside an LGSF wall

What is inside the wall?

A typical A Square LGSF wall is a layered system. Each layer has one job — and together they give you strength, comfort and a long life.

Exact specifications are chosen per project for its climate, fire and acoustic needs.

1
External finishCement fibre board, cladding or precast skin — weatherproof and paint-ready.
2
Weather membraneBreathable wrap that keeps rain out and lets moisture escape.
3
Galvanised steel studsMachine-cut LGSF frame, screwed and braced — the structure.
4
InsulationMineral wool or similar in the cavity for heat and sound control.
5
Interior boardGypsum or cement board, finished with putty and paint.
Quality

Checked at every stage

Dimensional checks

Members verified against drawings before dispatch.

Structural design

Every building engineered for its site, loads and wind.

Connection inspection

Screw patterns, anchors and bracing checked on site.

Water tests

Roofs and wet areas checked before finishes.

Handover walkthrough

Snag list closed with you before keys.

Written schedule

A clear timeline shared before we start.

Enquire

Ready for step one?

Share a sketch, a plan or just an idea. We will reply with the right system, a timeline and a free, itemised estimate.

We usually reply within one working day. Your details stay with A Square.

Thank you!

Our team will call you shortly. For a faster reply, message us on WhatsApp.